Lumen · Guides and tools

Lumen Sites for mine & construction sites

Rain, the wet season and haul roads

A few millimetres of rain can make an unsealed haul road slippery, and a wet-season downpour can close roads, flood pits and cut off access for days. This guide covers when the rain comes in each mining region, what it does to a site, and how sites plan around it.

When the rain comes

Across the north, the year’s rain is packed into the wet season. From December to March, Weipa gets 87% of its rain, Darwin 81% and Mount Isa 77%, and the Pilbara towns two-thirds to three-quarters. Further south it spreads out: the Bowen Basin gets 55–60% in those months, the Goldfields a little under half and the Hunter Valley about 40%, while Perth gets 8% and most of its rain in winter.

Averages for 1995–2024 from SILO (Queensland Government, CC BY 4.0), interpolated from Bureau of Meteorology observations. Rain days have 1 mm or more. Select a town for its month-by-month figures.
TownRain a year (mm)Wettest monthShare falling December to MarchRain days a year
Darwin1746Jan 478 mm81%101
Weipa1981Feb 508 mm87%107
Port Hedland329Feb 76 mm75%25
Karratha311Feb 86 mm66%21
Newman363Jan 87 mm72%36
Mount Isa488Jan 126 mm77%41
Moranbah588Feb 105 mm59%49
Emerald563Jan 90 mm55%48
Muswellbrook640Nov 74 mm41%74
Kalgoorlie275Feb 41 mm46%40
Roxby Downs160Feb 18 mm37%24
Perth692Jul 143 mm8%83

The totals vary enormously, from about 160 mm a year at Roxby Downs to nearly 2,000 mm at Weipa, where February alone averages 508 mm, close to double Kalgoorlie’s whole year. And in the Top End the dry season really is dry: Darwin averages 1–2 mm a month from June to August.

What rain does to a site

How sites manage it

Rain in the TARP

Many sites write rain into a trigger action response plan (TARP): rainfall thresholds, usually millimetres in an hour or in 24 hours, tied to actions such as lowering speed limits, stopping haulage on steep ramps, closing roads, and inspecting them before they reopen. The right thresholds depend on the road material, grades and drainage, so they are set site by site.

Before the wet season

Watch the water cart

Over-watering a haul road for dust can make it as slippery as rain does, so water carts belong in the same plan as the weather.

Reading rainfall numbers

Australia’s official daily rainfall is measured for the 24 hours to 9 am, so the figure for a date is mostly the rain that fell the evening and night before. Forecasts, on-site gauges and TARPs don’t always use the same window, so agree on which one your thresholds refer to.

Averages also hide big swings. In the north, one cyclone or monsoon low can bring more rain in a few days than an average year, and a dry year can bring almost none. Plan for the wet years, not the average one.

How Lumen Sites helps

Lumen Sites shows the rain forecast for the next 48 hours at each site against two thresholds you set, 10 mm and 25 mm over 24 hours by default, so road closures and haulage plans can be made the day before. For Australian sites it also shows the past year of daily rain from SILO, alongside lightning, storm risk, gusts and heat.

Related: Cyclone season for remote sites · Blasting and temperature inversions · Bowen Basin weather for site work · Pilbara weather for site work